LAND: $2 MILLION TO $5 MILLION
Final day of pile driving, where the cranes worked from opposite
directions to meet near the on-off ramp to Rt. 50/301
Deck board installation: a forklift was used to carry materials along the
4,439 LF of boardwalk
Geotextile fabric was used to protect the boardwalk
surface from damage during installation
www.piledrivers.org PILEDRIVER | 65
/www.piledrivers.org