e West Bay Bridge
The John J. Audubon Bridge
“Steel “Mandal Pipe Pipe Replaces Company Supplies Concrete Piling for Piles”
the
John James Audubon Bridge in south central Louisiana”
The West Bay Bridge widening project
near Panama City, Florida is critical to
the Hurricane evacuation plans for the
The John James Audubon Bridge project is
Panama a new City/Mississippi Fort Walton River Beach crossing areas between
and will
provide Pointe the Coupee gateway and to the West new Feliciana regional parishes
airport
scheduled in south central for construction Louisiana.
in the near future.
Pile The bridge--driving proposed for the to foundation be the longest piers cable-came stayed
to
a bridge halt in due North to America severe when and complete--unforeseen will replace
jobsite
conditions.an existing ferry With between the failure the communities of the 30” of square
New
concrete Roads and St.piles Francisville.
to pass pre-determined
requirements, the completion date for the
project The bridge prior will to the also next serve hurricane as the season only bridge
was
placed structure in on jeopardy.the Mississippi The contractor,River between working
Natchez,
with consulting engineers and the Florida
Mississippi and Baton Rouge, Louisiana
(approximately 90 river miles).
Department of Transportation, determined
that 30” diameter steel pipe with a heavy 5/8”
wall thickness would safely and adequately
overcome the existing problems.
A quick delivery of the 40,000’ of material
was imperative. MANDAL PIPE COMPANY
responded by supplying the project with over
175 truckloads of steel pipe allowing for the
work schedule to recover the original lost time.
On time delivery, with quality material, complete
submittals and impeccable traceability are
routine work for the professionals at MANDAL
PIPE COMPANY. Why don’t you give us a call?
Over 6000 Tons of Large Diameter Steel Spiralweld
pipe ranging in size from 48” to 96” O.D.
and in wall thicknesses from .500 to 1.000
inches was supplied by Mandal Pipe Company
for both the Pier foundations and the temporary
work trestle. Specially designed trailers were
constructed to facilitate the transportation of
the massive 30 Ton pieces of 96” x 1.000”
steel caissons manufactured in 60’ lengths.
The project is being constructed by Audubon
Bridge Constructors and is expected to be completed
by the summer of 2010.
MANDAL MANDAL PIPE PIPE COMPANY
COMPANY
50 Grayson Industrial Parkway
P.O. Box 927
Grayson, GA 30017
Snellville, GA 30078
Ph: 1-770-573-3022 • Fax: 1-770-573-3380
Ph: 1-770-573-3022 • Fax: 1-770-573-3380
Mandal Pipe Company... RELIABLE, EXPERIENCED, EFFECTIVE
www.mandalpipe.www.com mandalpipe.• info@com
mandalpipe.com
THINK PIPE…THINK MANDAL!
Mandal_Pipe.indd 1 4/18/07 9:41:30 AM
link
/www.mandalpipe.com
link
link
link
link
link
link
link